Solving Flow Divider Sourcing Challenges for GE Frame 5 Turbines | Colombia

. Solving Flow Divider Sourcing Challenges for GE Frame 5 Turbines | Colombia

The Challenge:

A leading power generation operator in Colombia struggled to source flow dividers for their GE Frame 5 gas turbines, facing long lead times and limited availability of critical components needed for routine maintenance and overhauls.

A close-up view of a large industrial gas turbine with visible red piping, showcasing its complex design in a clean, modern facility.

*The images are AI-generated and do not resemble the actual plant or client location.

Our Solution:

An illustration of a turbine part with labeled benefits, including exact dimensional specifications, cost-effective alternatives to OEM parts, rigorous quality validation, and reliable availability and delivery

*The images are AI-generated and do not resemble the actual plant or client location.

ATTS successfully identified and supplied precision-engineered flow dividers that deliver OEM-equivalent fit, form, and function:

  • Exact dimensional and performance specifications
  • Rigorous quality validation
  • Cost-effective alternative to OEM parts
  • Reliable availability and delivery

The Result:

The client achieved seamless installation with zero compatibility issues and performance matching original equipment standards. This solution has become their preferred source for ongoing maintenance requirements.

An illustration of a turbine part with labels highlighting benefits such as zero compatibility issues, seamless fit, performance matching OEM standards, and being a preferred source for ongoing maintenance

*The images are AI-generated and do not resemble the actual plant or client location.